Get current pricing for Cleaver Brooks, CB700-150 Boiler Was Only Operating For Six Months Before Being Idled. It Was Hydro Tested In April 2012 And Passed The Test.note: Item Is Owned And O . Product Category: Process Equipment, Sub Category: Process Boilers: